Quality Product Is Our Passion; Service&Innnovation Is Our Mission.
Place of Origin: | China |
Brand Name: | NANYA |
Certification: | CE/TUV/SGS/ISO9001 |
Model Number: | TF-10A |
Minimum Order Quantity: | 1 set |
---|---|
Price: | Negotiation |
Packaging Details: | Standard Export Packing |
Delivery Time: | 45-120days |
Payment Terms: | L/C, T/T, Western Union |
Supply Ability: | 30sets per month |
Product Name: | Pulp Tableware Making Machine | Automation: | Fully-automatic |
---|---|---|---|
Mold Plate Size: | 1100×800mm | Capacity: | 300~400kg Per Hour |
Type Of Material: | Wood Pulp; Or Bagasse Pulp; Or Bamboo Pulp; Or Straw Pulp | Forming Type: | Vacuum Suction / Thermoforming |
Standard: | CE/TUV/SGS/ISO9001 | Voltage: | 220 V - 450 V |
After-sales Service: | Engineers Available To Service Overseas Or Online Installation Guide | ||
Highlight: | Thermoforming Pulp Tableware Making Machine,450V Pulp Tableware Making Machine |
Pulp Tableware Making Machine/ Pulp Meal Box Making Machine/ Pulp Food Plate Making Machine
Description Of Pulp Molding Equipment
Pulp forming machine is a special equipment for making pulp fibers into wet semi-finished paper products through controlling the time of pulp sucking, vacuum pulp sucking and dewatering and special molds .The wet-press shaping machine uses special mold to dry and shape the wet semi-finished paper products by heating and pressurizing. The finished products is with high surface density, good strength and high finish.
Specification Of Pulp Molding Equipment
NO. |
Item |
Information |
Notes |
---|---|---|---|
1 | Target products | Degradable pulp molding dishware | |
2 | Automation | Automatic | |
(Forming, drying/pressing, edge cutting in one macine) | |||
3 | Capacity | 300-400 kg per hour | |
4 | Workshop Recommend | >=2000m2 | It could be adjusted according to the user's existing workshop |
5 | Type of Material | virgin pulp | Wood pulp; |
Or bagasse pulp; | |||
Or bamboo pulp; | |||
Or straw pulp | |||
6 | Material consumption | 300-450kg per hour | |
7a | Electricity consumption | 300~400kw | 750kw installed |
if heat by conduction oil | |||
Fuel consumption | Natural gas 100~140m3/h | conduction oil boiler required: thermal power 1200000kcal/h | |
if heat by conduction oil | |||
7b | Electricity consumption | 1000~1400kw | 2000kw installed |
if heat by electricity | (no fuel consumption) | ||
8 | Water consumption | 600-800kg/h | |
9 | Chemical for Water Resistance | 10~15kg/h | |
10 | Chemical for Oil Resistance | 2~ 3kg/h | |
11 | Operator Required | 7~9 people/shift |
Descriptions:
Application Of Pulp Molding Equipment
Manufacturing Plant
Tableware making machine
Advantages Of Pulp Molding Equipment
1.Mainly producing the pulp molded products, such as meal box, meal tray, coffee cups, cutlery, etc.
2.Material for the molded pulp products is bagasse pulp, bamboo pulp, wood pulp, bulrush pulp, wheat straw pulp and other pulp.
Food container | Dishware, tableware, lunch box, bowl, coffee cups… |
Cutlery | Fork, Knife, Spoon |
![]() |
Our services
After-sales Service: Engineers available to service machinery overseas
After Warranty Service: Video technical support, Online support
FAQ:
How can we guarantee quality?
Always a pre-production sample before mass production;
Always final Inspection before shipment;
What can you buy from us?
The whole production line, such as Hydrapulper, Forming machine,etc
What kind of material we can use as the raw material?
Any kind of waste paper like bagasse pulp, bamboo pulp, wood pulp, bulrush pulp, wheat straw pulp and other pulp.
What kind of Fuel can be used for the whole production line?
Electricity, conduction oil.
NO. | ITEM | DESCRIPTION |
1 | Payment Terms |
30% down payment by T/T, 70% before shipment by T/T or L/C at sight |
2 | Delivery Terms | FOB Guangzhou, China. |
3 | Delivery time |
150days. (if the holiday of Chinese New Year is during the manufacture time, Delivery time should extend 30 days) |
4 | Packages |
Packages suitable for ocean transport. The small parts are packaged by wooden boxes. The big parts are protected by wooden support. |
5 | Installation |
Seller should appoint 1 engineer to instruct buyer for installation, test-run and training. All the charges of air ticket, VISA , accommodation and food of the engineer should be responsible by buyer. Besides, the buyer should pay the engineers subsidy of USD200/person/day and offer translation service. |
6 | Warranty | 12 months after installation |
7 | After service |
|
8 | Quotation Validity | 90days after the offering date. |
Contact Person: Mr. Jerry Jiang
Tel: +8613422106696