Quality Product Is Our Passion; Service&Innnovation Is Our Mission.
Place of Origin: | Mainland, China |
Brand Name: | NANYA |
Certification: | CE, TUV,SGS, ISO9001 |
Model Number: | ER3000-B~ER6000-B |
Minimum Order Quantity: | 1 set |
---|---|
Price: | Negotiation |
Packaging Details: | Export Standard Packing |
Delivery Time: | Normally 45-75 days |
Payment Terms: | L/C, T/T,Cash, Western Union |
Supply Ability: | 1000 sets/ years |
Production Name: | Rotary Egg Tray Machine | Capacity: | 3000~10000 Pcs/Hour |
---|---|---|---|
Dryer: | 6-Layers | Fuel: | Diesel, Heavy Oil, LPG, Natural Gas, Coal, Wood, Steam… |
Material: | Waste Paper / Waste Carton / Used Newspaper | Voltage: | 220V-450V |
Automation: | Fully Automatic | Guarantee: | 12 Months |
Highlight: | Pulp Molding Production Line,Pulp Molding Machinery,Pulp Fruit Tray Forming Equipment |
Pulp Molding Rotary Egg Tray / Fruit Tray Forming Equipment with 6 Layers Dryer
Descriptions:
Specifications:
Model type |
ER3000-B |
ER4000-B |
ER5000-B |
ER6000-B |
|
Capacity |
3000pcs/hour |
4000pcs/hour |
5000pcs/hour |
10000pcs/hour |
|
Workshop Requirement |
400m2 |
500m2 |
600m2 |
700m2 |
|
Electricity Consumption |
~115kw |
~150kw |
~190kw |
~210kw |
|
Material Consumption |
180~210kg/h |
250~280kg/h |
320~350kg/h |
360~400kg/h |
|
Water Consumption |
600~800kg/h |
800~1000kg/h |
1000~1200kg/h |
1200~1400kg/h |
|
Fuel Consumption (one item selectable) |
Natural gas |
55~65m3/h |
70~80m3/h |
85~95m3/h |
100~110m3/h |
LPG |
19~22m3/h |
25~29m3/h |
31~35m3/h |
36~40m3/h |
|
Diesel |
45~55kg/h |
62~70kg/h |
78~85kg/h |
90~98kg/h |
|
Heavy oil |
46~56m3/h |
63~72kg/h |
79~87kg/h |
92~100kg/h |
|
Steam |
1.0~1.2ton/h |
1.3~1.5ton/h |
1.6~1.8ton/h |
1.8~2.0ton/h |
|
Wood |
190~220kg/h |
250~290kg/h |
310~350kg/h |
360~400kg/h |
|
Coal |
130~150kg/h |
160~190kg/h |
200~220kg/h |
240~270kg/h |
|
Worker requirement |
4~5person |
4~5person |
4~5person |
5~6person |
|
Container requirement for shipment |
6 x 40HQ |
7 x 40HQ |
8 x 40HQ |
9 x 40HQ |
|
Forming machine |
Rotary type with 8 plates. Each for 3pcs/time |
Rotary type with 8 plates. Each for 4pcs/time |
Rotary type with 8 plates. Each for 5pcs/time |
Rotary type with 8 plates. Each for 6pcs/time |
|
Drying production line |
20mx2.2mx4m |
22mx2.6mx4m |
22mx3.0mx4m |
22mx3.4mx4m |
|
Remarks: |
Working Theory:
YOUTUBE Links:
4000pcs/h with 6 layers dryer: https://www.youtube.com/watch?v=85eeIP8xCEY&t=3s
6000pcs/h with 6 layers dryer: https://www.youtube.com/watch?v=YIeLPQnwO4M
3000pcs/h with single layer dryer: https://www.youtube.com/watch?v=CX9NgjBZ0Nk
4000pcs/h with single layer dryer: https://www.youtube.com/watch?v=JCu3xNpnCsM
6000pcs/h with single layer dryer: https://www.youtube.com/watch?v=9XpyL-ggwi4
Applications:
Egg tray |
20,30,40packed egg tray… quail egg tray |
Egg carton |
6, 10,12,15,18,24 packed egg carton… |
Agricultural products |
Fruit tray, seeding cup |
Cup salver |
2, 4 cup salver |
Disposable Medical Care Products |
Bedpan, sick pad, female urinal… |
packages |
Shoe tree, industrial package… |
![]() |
Competitive Advantages:
Business Terms:
NO. | ITEM | DESCRIPTION |
1 | Payment Terms |
30% down payment by T/T, 70% before shipment by T/T or L/C at sight |
2 | Delivery Terms |
FOB Guangzhou, China. (Final transaction could be made in C&F or CIF, the freight and insurance should be decided according to the current rate when signing the contract). |
3 | Delivery Time | 45~75 days |
4 | Packages |
Packages suitable for ocean transport. The small parts are packaged by wooden boxes. The big parts are protected by wooden support. |
5 | Installation |
Seller should appoint 2 engineers to instruct buyer for installation, test-run and training. All the charges including air ticket, VISA , accommodation and food of the engineers should be responsible by buyer. Besides, the buyer should pay the engineers subsidy of USD200/person/day and offer translation service. |
6 | Warranty | 12 months after installation |
7 | After service |
1. The seller will send spare parts for one year use by free.2 2. 2. The seller will provide operating manual, drawing, process diagram for all of the equipments. 3. The seller will instruct the operation, maintain method for the buyer’s worker after installation. 4. The seller will instruct the production technology and prescription for the buyer’s engineer after installation; |
8 | Quotation Validity | 90 days after the offering date |
Contact Person: Mr. Jerry Jiang
Tel: +8613422106696