Quality Product Is Our Passion; Service&Innnovation Is Our Mission.
Place of Origin: | China |
Brand Name: | Nanya |
Certification: | CE/TUV/SGS/ISO9001 |
Model Number: | Tunnel Type Drying Production Line |
Minimum Order Quantity: | 1set |
---|---|
Price: | negotiation |
Packaging Details: | Export Standard Packing |
Delivery Time: | 45~75 days |
Payment Terms: | T/T or western Union or L/C |
Supply Ability: | 50 sets per month |
Product Name: | Tunnel Type Drying Production Line | Standard: | CE/TUV/SGS/ISO9001 |
---|---|---|---|
Voltage: | 220 V - 450 V | After-sales Service: | Engineers Available To Service Overseas |
Warranty: | 12 Months | Capacity: | 2~10 Ton/24hours |
Highlight: | paper pulp molding machinery,disposable paper plates making machine,Tunnel Type Egg Tray Dryer Machine |
Tunnel Type Paper Pulp Molding Drying Machine / Drying Production Line
Specifications:
Heating Material |
Length |
Width of the Tunnel |
Capacity |
Oil / Gas |
20~50 m |
2~4 m |
2~10 ton/24hours |
Coal / Wood |
20~50 m |
2~4 m |
2~10 ton/24hours |
Biomass Fuel |
20~50 m |
2~4 m |
2~10 ton/24hours |
Steam |
20~60 m |
2~4 m |
2~12 ton/24hours |
Conduction Oil |
20~60 m |
2~4 m |
2~12 ton/24hours |
Electricity |
20~50 m |
2~4 m |
2~10 ton/24hours |
Descriptions:
Production Information and Our Warranty:
Applications:
Egg tray | 20,30,40packed egg tray… quail egg tray |
Egg carton | 6, 10,12,15,18,24 packed egg carton… |
Cup salver | 2, 4 cup salver |
Artware |
Mask, Christmas balls, Easter Eggs , boutiques… |
Disposable Medical Care Products |
Bedpan, sick pad, female urinal… |
packages |
Shoe tree, industrial package… |
Competitive Advantages:
Business Terms
NO. |
ITEM |
DESCRIPTION |
1 |
Payment Terms |
30% down payment by T/T, 70% before shipment by T/T or L/C at sight |
2 |
Delivery Terms |
FOB Guangzhou, China. (Final transaction could be made in C&F or CIF, the freight and insurance should be decided according to the current rate when signing the contract). |
3 |
Delivery Time |
45-75 days |
4 |
Packages |
Packages suitable for ocean transport. The small parts are packaged by wooden boxes. The big parts are protected by wooden support. |
5 |
Installation |
Seller should appoint 2 engineers to instruct buyer for installation, test-run and training. All the charges including air ticket, VISA , accommodation and food of the engineers should be responsible by buyer. Besides, the buyer should pay the engineers subsidy of USD200/person/day and offer translation service. |
6 |
Warranty |
12 months after installation |
7 |
After service |
|
8 |
Quotation Validity |
90 days after the offering date |
Contact Person: Mr. Jerry Jiang
Tel: +8613422106696