Quality Product Is Our Passion; Service&Innnovation Is Our Mission.
Place of Origin: | China |
Brand Name: | Nanya |
Certification: | CE/TUV/SGS/ISO9001 |
Model Number: | EW2000-A |
Minimum Order Quantity: | 1 set |
---|---|
Price: | Negotiation |
Packaging Details: | Export Standard Packing |
Delivery Time: | 45 - 75 Days |
Payment Terms: | T/T, L/C, Cash or western Union |
Supply Ability: | 20 Sets Per Month |
Product Name: | Pulp Molding Machine | Capacity: | 2400 Pcs / H |
---|---|---|---|
Power Requirement: | 160 KW | Workshop Requirement: | 500m2 |
Voltage: | 220 V - 450V | Warranty: | One Year |
Drying Type: | Drying In Mould | Automation: | Fully Automatic |
Highlight: | Egg Carton Making Machine,Egg Box Machine,Full Automatic Egg Crate Manufacturing Machine |
2400Pcs/H Full-Automatic Egg Tray Equipment Rciprocatiing Forming Drying in Mould
Specifications:
Model Type |
EW2000 - A |
Capacity |
2400 pcs/hour |
Workshop Equirement |
500 m2 |
Electricity Consumption |
~110 kw |
Electricity Installed |
170 kw |
Material Consumption |
130 ~150 kg/h |
Water Consumption |
500~600 kg/h |
Worker Requirement |
5~6 persons |
Container Requirement for Shipment |
6 x 40 HQ |
Forming Machine (Reciprocating Type) |
Plate Size 2400*800 mm 12 pcs/time |
Drying Line |
30x3.4x2.4 m 1-Layer |
Remarks: |
Fuel Consumption (One Item Selectable)
LPG |
17~20 m3/h |
Diesel |
40~45 kg/h |
Heavy Oil |
42~46 kg/h |
Steam |
1.0~1.1 ton/h |
Wood |
170~200 kg/h |
Coal |
130~10 kg/h |
Description:
Production Information and Our Warranty
Applications:
Egg tray |
20,30,40packed egg tray… quail egg tray |
Egg carton |
6, 10,12,15,18,24 packed egg carton… |
Agricultural products |
Fruit tray, seeding cup |
Cup salver |
2, 4 cup salver |
Disposable Medical Care Products |
Bedpan, sick pad, female urinal… |
packages |
Shoe tree, industrial package… |
Competitive Advantage:
Business Terms
NO. |
ITEM |
DESCRIPTION |
1 |
Payment Terms |
30% down payment by T/T, 70% before shipment by T/T or L/C at sight |
2 |
Delivery Terms |
FOB Guangzhou, China. (Final transaction could be made in C&F or CIF, the freight and insurance should be decided according to the current rate when signing the contract). |
3 |
Delivery Time |
45-75 days |
4 |
Packages |
Packages suitable for ocean transport. The small parts are packaged by wooden boxes. The big parts are protected by wooden support. |
5 |
Installation |
Seller should appoint 2 engineers to instruct buyer for installation, test-run and training. All the charges including air ticket, VISA , accommodation and food of the engineers should be responsible by buyer. Besides, the buyer should pay the engineers subsidy of USD200/person/day and offer translation service. |
6 |
Warranty |
12 months after installation |
7 |
After service |
|
8 |
Quotation Validity |
90 days after the offering date |
Contact Person: Mr. Jerry Jiang
Tel: +8613422106696